Sign in once on this device. Your Supabase session will be remembered by the browser.
TRICITY FAB
Open Orders + Time Tracking
Precision Metal Products workflow dashboard
Open Orders
Materials Inventory
Create one material-code master record for each stocked sheet material. Parts and POs should use the same code.
Material Inventory Summary
Material Inventory Summary
Read-only view for operators. Material setup, edits, and deletes stay in Admin.
Material Purchase Orders
Choose from the Materials master list. Type, gauge, and sheet size will auto-fill from the material record.
Enter the material PO from QuickBooks here so the shop can track receiving and update stock.
Open Material POs
Material Required for Open Orders
Show / Hide Materials
Unchecked materials stay hidden on this device until you turn them back on.
Cost Comparison
Quoted vs actual cost by open order line. This keeps detailed costing off the operator Open Orders page.
BOM Setup
Add one child part at a time for each parent assembly or weldment.
Quick Add Child Part
Create the new child part here, then it will be selected automatically back in BOM Setup.
BOM Parents
Selected Parent BOM
Estimated Cost Explosion
Choose a part or parent part from the dropdown to load the exploded estimate. Use Open Exploded BOM to launch the full-screen BOM viewer.
Exploded Costed BOM Viewer
Live Dashboard
Active Jobs
0
Operators Running
0
Finished Jobs Today
0
Qty Today
0
Order Details
Part Lookup
Select a part to view its saved details, parent/child BOM information, and open available drawings or setup sheets. This page is read-only.
Select a part to view its saved details and open its drawing or setup sheet.
Active Jobs
Finish Job
Add time that was worked but not captured by the clock, such as forgetting to clock in for 30 minutes.
Subtract break time or other non-working time from the clocked job time.
Stop Job Incomplete
Add time that was worked but not captured by the clock.
Subtract break time or other non-working time from the clocked job time.
This keeps the part on the same process so it can be started again later.
Job History
Part Setup Wizard
Guide a new part through basics, material, routing, and quote standards without jumping around Admin.
Step 1 of 5 — Part Basics
Set the part number, description, links, and notes.
Part Basics
Use Load Existing Part if you want to edit a saved part and its current route/times inside the wizard.
Version 2: copy material, routing, and quoted times from a similar saved part without leaving the wizard.
What happens next
Step 2 — Material
Choose an existing material, build a new material master record, or select No Material Needed for a weldment/assembly.
Step 3 — Routing
Build the part route in order so the shop sees the correct process sequence.
Step 4 — Quote Standards
Assign quoted minutes for each route step without leaving the flow.
Material
New Material Setup
Routing
Build the route in workflow order. The last step will be the completion step in open orders.
Quote Standards / Process Times
Set quoted minutes for each route step. Existing generic quote standards for this part will auto-fill when available.
Review + Save
Current Setup
Choose a section to keep the Admin page compact. Show All restores the full page.
Employee Activity
See what each operator logged today or this week, including total hours and the jobs/processes they worked on.
Choose Today or This Week.
Operators
Materials
Manage the material master here. Parts, Material POs, and inventory all use these material codes.
BOM Setup
Set parent parts to expand into child parts when added to Open Orders.
BOM / Estimated Cost
Admin-only estimated cost, selling price, and gross margin review.
Part Setup Wizard
Walk through part basics, material selection or creation, routing, and quoted process times in one guided setup flow.
Part Lookup
Select a part to view its saved details and open its drawing or setup sheet.
Parts
Store drawing, setup sheet, description, and material planning data with the part.
Customers
Processes
Create Open Order
Creates one open-order line per part.
Part Route Setup
If this dropdown is empty, add processes first on the Admin page.
Add steps from the Admin process list in workflow order. The last step in the route will mark the part complete.
QuickBooks Reconciliation
Upload the daily QuickBooks Estimates by Customer report (.xls, .xlsx, or .csv). The comparison is read-only: it does not change QuickBooks or the Tracker. Missing orders can be loaded into the Create Open Order form for review before saving.
No QuickBooks report loaded.
Quote Standards
Manage quoted minutes by part and process. The Quote Standards process fields now match the processes set up on the Admin page.
Quote Analysis
Review quoted vs actual performance by job and by part.
Job Cleanup
This cleanup only removes saved rows from Job History. It does not delete parts, operators, routes, quote standards, customers, processes, or open orders.
Data Backup & Emergency Restore
Read-only backup: these backup buttons only read data from Supabase and cannot update or delete records.
The Dropbox button uses your computer's Save dialog. If Dropbox is synced on this computer, choose your Dropbox folder. In browsers that do not support direct Save As, the backup will download normally so you can move it into Dropbox.
Emergency Restore
Use this only when recovery is needed. Restore writes data to Supabase. It does not delete extra rows that are newer than the backup, and it does not recreate database tables, RLS policies, or other Supabase configuration.
No backup selected. Choose a Tri City Tracker JSON backup to preview it before restoring.
Danger Zone
This deletes only the saved Job History table in Supabase. It does not delete parts, operators, routes, quote standards, customers, processes, or open orders.
Open Order Admin View
Quote Analysis
Admin-only page for quote vs actual review.
Quoted Minutes Today
0
Actual Minutes Today
0
Variance Today
0
Jobs Over Quote
0
Completed Order Labor Review
Compare quoted labor to actual clocked labor for one completed top-level order/release, including all child parts.
Worst Jobs
Finished jobs with the biggest overrun.
Best Performing Jobs
Finished jobs with the biggest underrun.
Parts Needing Quote Review
Highest average positive variance by part.
Best Performing Parts
Average minutes are at or under quote.
Quote Standards
Admin-only page for quoted minutes by part. Enter one part and all process times together.
Quoted Minutes Per Process
Enter one part and quoted minutes for any process you use. Process fields match the Admin process list by process name.